
Detached ADU Construction
A separate backyard home on its own foundation, with its own entrance, kitchen and bath.
More on detached adu constructionA lot with a garage, a lot with a bare yard and a lot with a back house nobody permitted all lead to different jobs. This page sorts the work by what you have in hand, because the starting point decides the rules, the plans and most of the cost. State law protects a new detached ADU of up to 800 square feet and caps its side and rear setbacks at 4 feet (HCD ADU Handbook, March 2026).
Every page below says what we check first, how the work runs and what the planning range is. The picker on the home page can narrow it down, and the cost page has an estimator for the ranges. We stay inside ADU work and what surrounds it, which means no kitchen remodels, roofing or pools.
Five ways to put a new unit on the lot, from a factory-built home to a hillside foundation.

A separate backyard home on its own foundation, with its own entrance, kitchen and bath.
More on detached adu construction
A new unit built onto the side or back of the house, sharing a wall but with its own entrance.
More on attached adu additions
A unit built on top of a detached garage, so the yard stays a yard and the cars keep their spot.
More on second-story adus over a garage
A factory-built unit set on a foundation you prepare on site, with plan check handled like any other ADU.
More on prefab and modular adus
Backyard homes on slopes, narrow lots and fire-zone parcels, with shoring, drainage and access planned first.
More on hillside and tight-lot adusFour jobs that start with walls, a slab or a unit that is already there.

A two-car garage turned into a legal studio or one-bedroom, with the slab, walls and utilities redone.
More on garage conversion adus
A small unit carved out of a bedroom or the attached garage, with an efficiency kitchen and its own door.
More on junior adu (jadu) conversions
Attics, basements, bonus rooms and add-on rooms turned into a legal separate unit.
More on in-law units and existing-space conversions
A garage unit or back house built without a permit, brought up to code and put on the record.
More on legalizing an unpermitted adu or garage unitThe paperwork and the pipes. Any of these can be hired on its own, before or alongside a build.

Floor plans drawn to your lot, with setbacks, sun, privacy and the main house kept in mind.
More on adu design and floor plans
Plan check, corrections and permit pickup handled in the order the city wants them.
More on adu permits and plan check
Panel upgrades, new meters, water lines and sewer laterals sized for a second home on the lot.
More on adu power, water and sewer connectionsStart with space you already own. A JADU is capped at 500 square feet and must sit inside the house, and an attached garage counts (HCD ADU Handbook, March 2026). Garage conversions and in-law units reuse walls that already stand, which is why their planning ranges start lower: $50,000 to $150,000 for a JADU and $100,000 to $220,000 for a garage.
A new building costs more because it needs a foundation, framing and a roof. A 600 square foot detached unit runs $180,000 to $300,000 in the same published figures, and a unit over a garage runs $220,000 to $400,000. Those are planning ranges, and the cost page shows each one with what moves it.
Slope, a fire zone or a tight side gate can flip the order. And a hillside lot adds an estimated $30,000 to $90,000 on top of the base build, so the cheaper type on paper may not be the cheaper one on your lot.
Often yes. Section 66323 of state law allows a converted ADU, a new detached ADU and a JADU to be built together on one single-family lot, and a local agency cannot stack parking, height or other standards beyond what that section lists (HCD ADU Handbook, March 2026). Local rules, hillside limits and historic overlays still count, so we look at your address first.
Only if the main house already has them. California says a city can require sprinklers in an ADU or JADU only when the existing house is required to have them, and building an ADU cannot trigger a sprinkler requirement for the house (HCD ADU Handbook, March 2026). Los Angeles adds a trigger: remodeling done with the ADU above 50 percent of the house's replacement cost within a year.
Read the hillside and tight-lot page first, then the page for the type of unit you want. Slope changes the foundation, access and what the city asks for before a permit, and LADBS leaves slopes steeper than 5 to 1 out of its streamlined unpermitted-unit process. We sort that out at the site visit, before drawings are paid for.
No. We stay with ADUs and the work around them: design, permits, utility connections and legalizing a unit. If a kitchen remodel in the main house is part of your plan, hire for that separately, and tell whoever does it that an ADU is coming, since LADBS counts remodel work done with an ADU toward its sprinkler trigger.
Tell us the space you have and your address. A site visit comes before any price.