The cost of an ADU in Los Angeles runs from about $50,000 for a junior unit inside the house to $400,000 for a unit over a garage, and a hillside lot can add more on top. The figures are taken from Los Angeles-area price pages and cost guides we read in November 2026. They tell you which jobs are in the same price class. They do not tell you what your lot will cost.
For scale, the Census Bureau puts the median value of an owner-occupied Los Angeles home at $921,200 (ACS 2020-2024). The estimator below applies the ranges to a type and a size. Past that, the number depends on the slab, the panel, the slope and the city, which is why the price comes in writing after a site visit.
ADU Cost Estimator
Pick a type of ADU and a size. The ranges come from published Los Angeles-area figures and are planning numbers, not a quote.
ADU Cost in Los Angeles: The Ranges
Planning figures taken from published sources. A written estimate is the only quote.
Detached ADU Cost in Los Angeles
A new backyard home on its own foundation. Smaller units cost more per square foot, so the price does not fall in step with the size.
| Job | Figure |
|---|---|
| Detached ADU, about 600 to 800 sq ft About $300 to $500 per sq ft at that size; finish level, slope and utility distance move it | $200,000 to $400,000 |
| Detached ADU, 600 sq ft (estimator default) Worked out as 600 sq ft at $300 to $500 per sq ft | $180,000 to $300,000 |
Garage Conversion Cost in Los Angeles
The cheapest way to a legal unit when the garage is sound. The slab and the electrical panel decide most of the spread.
| Job | Figure |
|---|---|
| Garage conversion, 350 to 500 sq ft garage Slab and wall condition, panel upgrade, ceiling height and finish level | $100,000 to $220,000 |
JADU Cost in Los Angeles
A unit of up to 500 square feet inside the main house.
| Job | Figure |
|---|---|
| Junior ADU inside the house, up to 500 sq ft Kitchen and bath work, a separate entry, and the state of the wiring and plumbing | $50,000 to $150,000 |
Attached ADU Cost in Los Angeles
A new unit that shares a wall with the house.
| Job | Figure |
|---|---|
| Attached ADU addition, 400 to 800 sq ft Foundation, how it ties into the house, and finish level | $170,000 to $350,000 |
Over-Garage ADU Cost in Los Angeles
A unit built on top of a detached garage. What the garage needs underneath it can change the total.
| Job | Figure |
|---|---|
| Second-story ADU over a garage, 400 to 800 sq ft Footings and posts under the garage, stairs and fire separation | $220,000 to $400,000 |
Prefab and Modular ADU Cost in Los Angeles
A factory-built unit set on a foundation prepared on site. A unit price alone leaves out delivery, the foundation and hookups.
| Job | Figure |
|---|---|
| Prefab or modular ADU, installed, 400 to 800 sq ft Delivery access and crane, foundation work and utility hookups | $170,000 to $350,000 |
ADU Design Cost in Los Angeles
Drawings for one ADU. Engineering is extra, and a custom design costs more than a standard plan set.
| Job | Figure |
|---|---|
| Design and floor plans, one ADU Standard or custom plan, number of changes, engineering and energy reports | $7,500 to $25,000 |
ADU Permit and Plan Check Cost in Los Angeles
Government and school fees for one ADU. The city sets these, and faster handling by a third party costs extra.
| Job | Figure |
|---|---|
| Permit and plan check fees, one ADU Size over 500 sq ft, which city, and extra review on hillside or coastal lots | $5,000 to $20,000 |
| Glendale development impact fee on a larger ADU Glendale says ADUs under 750 sq ft do not pay it | about $5,000 |
In-Law Unit Cost in Los Angeles
An attic, basement or bonus room made into a separate unit.
| Job | Figure |
|---|---|
| In-law unit in existing space, about 500 to 800 sq ft Kitchen and bath work, a separate entry, egress, and the wiring and plumbing already there | $60,000 to $175,000 |
ADU Utility Connection Cost in Los Angeles
Power, water and sewer for a second home on the lot.
| Job | Figure |
|---|---|
| Utility connections, one ADU on a typical lot Distance to the street, trenching, meter and panel upgrades, and where the sewer line runs | $3,000 to $20,000 |
Legalizing an Unpermitted Unit: Cost in Los Angeles
Drawings and permits for a unit built before 2020. Corrections to bring it to code are extra, and they can exceed the permit fees.
| Job | Figure |
|---|---|
| Drawings and permits to legalize a unit This is a thinner estimate than the others; the unit's condition decides the rest | $10,000 to $40,000 |
Hillside and Tight-Lot Cost in Los Angeles
Slope and access add work to any base build. This row is an add-on, not a total.
| Job | Figure |
|---|---|
| Extra cost for a hillside or tight lot Soils report, deepened footings or caissons, retaining walls, and access for equipment | $30,000 to $90,000 |
What Moves ADU Cost in Los Angeles
How Our Quotes Work
A written price from us lists design and engineering, permit paperwork and construction as separate lines. Permit and plan check fees are shown at cost. Utility connections, landscaping and appliances are each marked as included, as an allowance or as handled by you, so nothing is left unsaid. We write it after the site visit. Planning ranges on this page are for comparing jobs, not for signing.
Cost Questions
How close is the estimator to a real price?
Close enough to plan with, not close enough to sign. The estimator multiplies published Los Angeles-area ranges by a unit type and size, so it cannot see your slab, your panel or your slope. Treat the low end as a tidy lot and the high end as a lot with surprises. A site visit replaces the range with a written number.
Why does a small ADU cost more per square foot?
Because some costs do not shrink with the floor plan. Every ADU needs a kitchen, a bath, a water heater, a panel, a sewer connection and a permit, whether it is 400 square feet or 1,000. Spread over fewer square feet, those fixed costs raise the per-foot figure, which is why the published range for detached units is quoted per foot.
What is not inside these ranges?
Design, permit fees, utility connections and hillside work each have their own row, so a build range may or may not include them. Appliances, landscaping and demolition are the items most often left out or turned into allowances. A written price from us marks each one as included, an allowance or yours. Ask any builder for the same.
What is the most I can be asked to pay up front?
The most a home improvement contractor may take up front is $1,000 or 10 percent of the price, whichever is smaller (Business and Professions Code 7159). Bold type in the contract must state the limit, and later payments follow completed work. A request for a big deposit before any work begins goes beyond the law, so decline it.
Facts We Checked
- On this page: planning ranges: JADU $50,000 to $150,000; detached ADU $180,000 to $300,000 at 600 sq ft; over-garage $220,000 to $400,000; hillside add-on $30,000 to $90,000Source: Draft planning range from published Los Angeles-area ADU price pages and guides, read November 2026
- On this page: permit and plan check planning range $5,000 to $20,000 for government and school fees, and LADBS bases permit and plan check fees on project valuationSource: dbs.lacity.gov/standard-plan-program
- On this page: glendale says ADUs under 750 sq ft do not pay its development impact fee of approximately $5,000Source: www.glendaleca.gov/government/departments/community-developm
- On this page: median value of owner-occupied homes in Los Angeles is $921,200 (ACS 2020-2024 5-year)Source: api.census.gov/data/2024/acs/acs5?get=group(B25035)&ucgid=16
- On this page: a home improvement down payment may not exceed $1,000 or 10 percent of the contract price, whichever is lessSource: leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?
Want a Real Number for Your Lot?
Call or email with your address. A site visit and a written price replace the range.