Detached ADU Construction
New detached units hold to 800 sq ft with 4-foot rear and side setbacks, and 16 feet in height.
More on detached adu construction
Long Beach has no size limit on conversions but adds coastal and historic permits. We check where your lot falls first.
The case for an ADU builder in Long Beach, CA begins with the city's age. 78.6% of its 181,477 homes were built before 1980, the highest share of the cities we plan in, and the median home dates from 1959. A big stock of older houses means a lot of garages and back rooms that could become units, and a lot of slabs and wiring that need a look before they do.
Long Beach also takes a clear position on conversions: no size limit on them, and they keep the existing setbacks and height. New construction runs on tighter numbers. The two kinds of project are priced and permitted differently, so the first call sorts out which one you have.
We have no yard or office to measure from, so no miles or drive time here. We plan ADUs in Los Angeles County cities, including Long Beach, Santa Monica, Pasadena, Glendale and Burbank. Call with the address and say what you are thinking of using, a garage, a spare room or open yard. We tell you which Long Beach path applies, and if a site visit makes sense it is set before any price is written.
Long Beach counts 181,477 homes, with 61,475 (33.9%) built in 1949 or earlier and 142,618 before 1980. Of 170,927 occupied homes, 41.2% are owner-occupied and 58.8% rented. A median owner-occupied home is valued at $806,600, the lowest in the six cities we plan in, and 40.5% of all homes are detached houses (ACS 2020-2024).
Long Beach splits ADUs into conversions and new construction, and the two follow different rules.
Conversions come first because they are the easy case. Long Beach says conversions maintain existing building setbacks and height, and there is no size limit on them. A garage that is 18 feet wide becomes the unit it already is. That makes the garage the first thing we measure, and the slab, the framing and the electrical panel the first things we open.
New construction has its own numbers. A new ADU has a 4-foot rear setback and a side setback of 4 feet or the zone's setback, whichever is less. An attached unit is limited to 25 feet or 2 stories, or the zone's height if lower, and a detached one to 16 feet, or 18 near transit plus up to 2 feet to match the roof. A detached new ADU is held to 800 sq ft.
The coast and history add permits. For any ADU or JADU in a historic district or at a designated landmark, Long Beach requires a Certificate of Appropriateness, with no public hearing, filed with the building permit. In the Coastal Zone it requires an Administrative Local Coastal Development Permit, also with no hearing and also filed with the building permit. Neither is a separate trip, but both go in on day one.
Parking exemptions are broad. Per the city ADU information bulletin, Long Beach exempts ADUs from parking in a Parking Exempt Area, within a half mile of any transit stop, in historic districts, in conversions, and when permit parking is not offered. JADUs need none. Most garage conversions therefore need no replacement parking.
Owner occupancy applies narrowly. Long Beach requires it, in the home or the JADU, only if the JADU shares a bathroom with the main dwelling. A detached or attached ADU carries no such requirement, and state law does not allow one.
The City's ADU page lays out four steps: Planning Bureau, Permit Center, Plan Review, then Permits and Construction. Its pre-approved ADU program is for new construction only, not conversions of existing space. Fees and review times for Long Beach are not on the pages we read, so we ask the city and show them as separate lines.
Twelve kinds of ADU work for Long Beach lots, each with what the conversion, coastal or historic rules do to it.

New detached units hold to 800 sq ft with 4-foot rear and side setbacks, and 16 feet in height.
More on detached adu construction
No size limit on a Long Beach conversion, which also keeps its existing setbacks and height.
More on garage conversion adus
A JADU is 500 sq ft and needs no parking, and owner occupancy applies only if it shares a bathroom.
More on junior adu (jadu) conversions
Attached units run up to 25 feet or 2 stories, at 50 percent of the house or 800 sq ft, whichever is more.
More on attached adu additions
A new second story is height-checked at 25 feet attached or 16 detached, with a historic check first.
More on second-story adus over a garage
The city's pre-approved program covers new construction only, so a factory unit is checked against it.
More on prefab and modular adus
Conversion plans start from the existing walls, and new plans from the 4-foot setbacks and 800 sq ft.
More on adu design and floor plans
A Certificate of Appropriateness or coastal permit is filed with the building permit, on day one.
More on adu permits and plan check
Conversions here exempt the ADU from parking and keep their setbacks, which suits older houses.
More on in-law units and existing-space conversions
Where fees and review times are not posted, we ask Long Beach and list each charge as its own line.
More on adu power, water and sewer connections
Pre-2020 units cannot be denied over building standards alone, with health and safety still reviewed.
More on legalizing an unpermitted adu or garage unit
Narrow lots get the zone's side setback or 4 feet, whichever is less, checked before the plan.
More on hillside and tight-lot adusLong Beach owners hold 41.2% of occupied homes, and 40.5% of all homes are detached houses, so family units tend to go on the single-family lots. A converted garage has no size limit, and a new detached unit tops out at 800 sq ft. We start with the garage because it is the largest shell already on the lot, and the numbers show quickly whether it can carry the plan.
Plan my backyard homeRenters occupy 58.8% of Long Beach's occupied homes, and the median owner-occupied value of $806,600 is the lowest of the cities we plan in. A rental ADU here adds income to a lot that cost less to buy. State law requires 66323 ADUs and all JADUs to rent for longer than 30 days, and we plan the entrance and meters so the unit works as a rental.
Plan my backyard homeTell us the street and whether you want to convert a garage or room, or build new on open yard.
We open the garage, measure the yard, and ask if it is a historic district or the Coastal Zone.
You get the price in writing, with any historic or coastal permit shown on its own line.
We file with the Permit Center, answer plan review, and move to building once permits are issued.
More pages for cities close to Long Beach.
No. Long Beach says conversions have no size limit and maintain existing building setbacks and height. New construction is limited: a detached new ADU is 800 sq ft, and an attached one is up to 50 percent of the main dwelling or 800 sq ft, whichever is more. A JADU is 500 sq ft.
If the lot is in the Coastal Zone, Long Beach requires an Administrative Local Coastal Development Permit for any ADU or JADU. There is no public hearing, and it is filed with the building permit. We ask where the lot sits at the first call, since the permit goes in on the same day as the building application.
Long Beach requires a Certificate of Appropriateness for any ADU or JADU in a historic district or at a designated landmark. It has no public hearing and is filed with the building permit. Historic districts are also exempt from ADU parking. We check the district map before drawing, because it can change the exterior.
Often not. Long Beach exempts ADUs from parking in a Parking Exempt Area, within a half mile of any transit stop, in historic districts, in conversions, and when permit parking is not offered. A JADU needs none. If none of those apply, the ADU needs one space, and we say so before the plan is drawn.
About us. Eagle Rock Backyard Homes plans backyard homes for owners in Los Angeles and Los Angeles County. Scope and price are agreed in writing before any work starts. More about us.
Call Eagle Rock Backyard Homes with your address. We say which Long Beach path your lot takes.