A backyard home starts with setbacks, a sewer line and a gate wide enough for a mini excavator. Learn what your lot allows before you call.

  • Lot checked before drawing
  • Written price after a visit
  • 4-foot setbacks, state rule

A detached ADU is a six-figure decision, so the first question is if you need to build new at all. If your garage is sound, a garage conversion usually costs less: planning ranges of $100,000 to $220,000 against $180,000 to $300,000 for a detached unit. Detached ADU construction in Los Angeles, CA earns the higher number when the garage is too small or too damaged. Compare the two on the garage conversion page.

The lot decides a detached build before the floor plan does. California law (HCD ADU Handbook, March 2026) caps side and rear setbacks at 4 feet and protects a new detached ADU up to 800 square feet. Where the unit lands inside those lines, how materials reach it and where the sewer runs move the price more than the finish level does.

We start with your address. Send the lot size and photos of the yard and driveway, and we tell you what we would check before anyone draws a wall: survey, easements, utility lines and slope. Some of those answers change whether a detached unit is the right ADU at all.

Detached ADU Construction in Los Angeles, CA and Nearby Towns

Detached calls come from Glendale, where the city caps an ADU at 1,000 square feet and bars rooftop decks, Burbank, where a detached ADU tops out at 17 feet and sits 5 feet from other buildings, and Pasadena, where free City standard plans exist for lots off a slope.

Is a Detached ADU the Right Fit for Your Lot?

Six things we look for in a backyard before we say a detached unit is worth drawing.

An empty backyard corner with stakes and string where a small house could go

Unused backyard corner

A corner with room for a 4-foot setback on two sides may hold a small detached unit.

A driveway running past the house to a back lawn with a basketball hoop

Driveway that runs to the back

A driveway to the back lets concrete, lumber and a mini excavator in without crossing your house.

An unused pool house with peeling trim and a dusty window

Pool house nobody uses

A sound outbuilding may convert in place with no added setback, if the city accepts its slab and walls.

An old tool shed sitting on a cracked concrete slab

Old shed on a slab

A shed slab may be too thin for walls and a roof, so it gets checked before anyone counts on it.

A chain link fence close to the yard edge with a neighbor's wall behind

Fence line close to the yard

Setbacks run from the property line, so a fence a few feet off can hide how much room you really have.

A sloped back lot with a dry-stacked block wall and weeds

Sloped back lot

A slope can add retaining walls, deeper footings and a soils report before any framing starts.

Backyard Homes for Family and for Renters

One building can house a relative now and a tenant later, and the state sets the basic rules for both.

Family

A detached unit gives a parent, an adult child or a caregiver their own door, kitchen and bath, with a yard between the buildings. California says a city cannot require owner-occupancy for an ADU, so a family unit does not tie you to the property. State law protects up to 800 square feet and city ordinances must allow at least 850, so a one-bedroom for a parent has room, lot permitting.

Plan my backyard home

Renters

Nightly stays are out for a new detached ADU, because the rental term in California has to be longer than 30 days. It can be sold separately only if your city has adopted a condominium ordinance. The Census counts 64.0 percent of occupied homes in Los Angeles as renter-occupied.

Plan my backyard home
Detached adu construction at a rental or multi-unit property

How a Detached Build Moves, Step by Step

A detached build moves in a fixed order, and the city inspects between stages.

  1. 01

    Lot and survey review

    We read your survey, setbacks, easements and utility lines before anyone draws a wall.

  2. 02

    Plans and plan check

    We submit through the city and answer corrections; the city has 60 days on a complete application.

  3. 03

    Foundation and framing

    Footings, slab, frame and roof go up in order, with city inspections between stages.

  4. 04

    Utilities and final

    Power, water and sewer connect, the city does its final inspection, and you walk the unit with us.

Tight Side Yards and Long Driveways

On a lot with a narrow side yard and a gate, access changes the build more than the floor plan does. Concrete may have to be pumped over the house, and a mini excavator that fits through a 36-inch gate digs slower than a full-size one.

At the first visit we measure the gate, the side yard and the run from the street to the back corner. When access is narrow the labor and schedule grow, and that extra shows up in the price before work begins. Usually the driveway is the easier problem. (A driveway can be driven on; a side yard has to be carried through.) A long run also stretches the sewer, water and power lines, which moves the utility figure in the cost table below.

  • Gate and side-yard width measured at the first visit
  • Trench path for sewer, water and power drawn on the plan
  • Pump, hand-carry or small equipment chosen before the pour
  • Dumpster and delivery spots set around your driveway, with notice to neighbours before demolition or a pour
Plan my backyard home
Detached adu construction: the bigger version of the job

What Your Lot Has to Allow

The floor every city has to meet comes from California law (HCD ADU Handbook, March 2026). No city may ask for more than a 4-foot side and rear setback. Protection under state law covers a new detached ADU up to 800 square feet; a local ordinance has to allow 850, or 1,000 when the unit has more than one bedroom. Height starts at 16 feet, rises to 18 within a half mile walk of major transit, and gains 2 more feet to match the main roof pitch.

In Los Angeles, the Planning Department memo ZA Memo 143 applies the 4-foot setbacks to new detached ADUs, sets a 16-foot base height that reaches 20 feet with transit nearby and a matching roof pitch, and keeps floor area limits from blocking the state minimum sizes.

Parking and fees come next. A city may not ask for more than one space per unit or bedroom, whichever is less, and none is required within a half mile walk of public transit. An ADU of 750 square feet or less pays no impact fee, and a larger one pays in proportion to the main house. LAUSD school fees apply over 500 square feet in Los Angeles, says LADBS.

One newer rule surprises owners: the 2025 Energy Code counts a new detached ADU as new construction, so solar PV has to be installed fresh for it unless an exception applies.

Before the Excavator Shows Up

Los Angeles wants clearances before a permit issues. The Bureau of Engineering approves sewer capacity for every ADU, LAFD checks hydrants and access, and LADWP signs off only if the building sits on, or within 10 feet of, a Public Utility Easement. A sewer answer can move the building on the lot, so we ask first.

If LADWP serves your address, ask for a meter spot before a new panel goes in. It is free for panels up to 320 amps, and the visit is booked 5 to 15 business days out, with a sketch left for the inspector who may want it.

When the lot sits in a mapped liquefaction or earthquake-induced landslide zone, the Seismic Hazards Mapping Act has cities require a site-specific geotechnical report before they permit most buildings made for people. On a sloped or mapped lot we order that report before the drawings.

But the survey comes first. Setback lines, easements and slope all come off a survey, and a sketch from memory will not do.

What Your Side of the Job Looks Like

A detached ADU runs on a long calendar, so here is how the months split.

How long
Drawings take about one to two months, and the city's plan check another two to four with corrections; it keeps its own calendar. Construction of a detached unit runs about four to six months depending on size and weather. First call to move-in is roughly eight to twelve months, and longer on a hillside, coastal or custom lot.
Mess and cleanup
Fencing goes up around the building area, and dust and runoff are controlled the way the city requires. A dumpster and portable toilet stay on site.
Do I need to be home
Not all day. We agree on yard access in advance, along with a way to reach you for decisions and inspections.
Permits
Both ePlanLA and PermitLA, the LADBS systems for plan check and permits, need an Angeleno account. We handle the application and the corrections, and you sign the forms the city requires.
Deposit and payments
Any home improvement contract above $500 has to be written, with a three-day right to cancel. The down payment is capped at $1,000 or, if lower, 10 percent of the contract price (Bus. & Prof. Code 7159). Payments after that follow finished stages such as foundation, framing, rough utilities, drywall and final inspection, each with a dollar amount in the contract.

What Moves the Price of a Detached ADU

Published Los Angeles-area figures put a detached ADU at about $300 to $500 per square foot, which for a 600-square-foot unit comes to $180,000 to $300,000. Some builders fold design, permits and utilities into one number and some quote construction only, so ask what a figure includes. Smaller units cost more per square foot, and utility distance, slope and access move the total.

JobFigure
Detached ADU, about 600 sq ft
Our arithmetic: $300 to $500 per sq ft times 600 sq ft
$180,000 to $300,000
Design and floor plans
One plan set; engineering is extra
$7,500 to $25,000
Permit and plan check fees
Government and school fees; the city sets them
$5,000 to $20,000
Utility connections
Distance to the street, trenching, meters and sewer location
$3,000 to $20,000
Extra for a sloped or tight lot
Extra cost layered on the base build, not a full price
$30,000 to $90,000
Per-square-foot ranges for detached units come from Los Angeles-area ADU price pages read in November 2026. Your written price follows a site visit. (source). Try the cost estimator.

Detached ADU Questions, Answered

Can I build a detached ADU on a small backyard?

It can work. California caps side and rear setbacks at 4 feet and lets an efficiency unit be as small as 150 square feet, so a small yard may still hold a studio. Easements and slope count too, and a survey settles them.

Do I have to add parking for a detached ADU?

Often not. A city can ask for one space per unit or per bedroom, whichever is fewer, and none is required within a half mile walk of public transit or in a historic district. Los Angeles asks for one space unless another state exemption applies.

Can I sell the backyard home separately from the house?

Rarely. A separate sale is possible if your city has adopted a condominium ordinance (Gov. Code 66342) or the qualified nonprofit exception in section 66341 applies. Otherwise the unit stays part of your lot. Ask your planning counter before you spend on design.

What happens if the city sends back corrections?

A city must approve or deny a complete ADU application within 60 days, and a denial must list in writing what is deficient and how to fix it. We answer those letters and resubmit. Each round adds time to plan check.

Is a pre-approved plan faster than a custom one?

It can be. Standard plans from LADBS's Standard Plan Program move through plan check faster, yet each one is still reviewed against your lot's conditions and clearances before a permit issues. Pasadena lists plan check of about 3 to 4 weeks for its free standard plans.

About us. Eagle Rock Backyard Homes plans backyard homes for owners in Los Angeles and Los Angeles County. Scope and price are agreed in writing before any work starts. More about us.

Detached ADU Construction in Los Angeles, CA

Call Eagle Rock Backyard Homes with your address and a photo of the yard. The written price comes after a site visit.