Skip to content
ADU building in Pasadena, CA: a typical home in Pasadena, CA

ADU Builder in Pasadena, CA

Pasadena hands out free standard ADU plans and a stated plan check time. Whether they fit your lot is the first thing we check.

  • Planned for Pasadena lots
  • Median home built 1961
  • Plan check about 3 to 4 weeks

Hiring an ADU builder in Pasadena, CA starts with a choice: draw a custom plan, or start from one the city gives away. Pasadena's ADU Standard Plans are free from the City, with a plan that meets the 2025 California Building Code. That choice depends on the ground under the lot, because the plans are not meant for slopes, hillsides or expansive soil.

The other half of the story is age. The median home here dates from 1961, and 36.1% of the city's homes were built in 1949 or earlier. Older lots come with older garages, fences and utility lines, so we ask what is standing before we say which plan route fits.

We are not tied to a yard or office. Our ADU planning covers Los Angeles County cities such as Pasadena, Glendale, Burbank, Santa Monica and Long Beach. A first call about a Pasadena lot goes like this: you read us the address, we ask about slope, soil and any historic district, and we say whether the city's standard plan or a custom drawing is worth pricing. A visit comes after.

Pasadena has 63,203 homes. 72.2% of them (45,612) were built before 1980 and 36.1% (22,846) in 1949 or earlier. Of the 57,425 occupied homes, 42.5% are owner-occupied and 57.5% rented. A median owner-occupied home is valued at $1,093,300, and 42.7% of homes are detached houses (ACS 2020-2024).

What's Different About an ADU in Pasadena

Pasadena runs its ADU program differently from the cities around it, with free plans, a published clock and a loan.

The city's standard plans come with numbers. For a standard plan, completeness review takes 1 to 2 business days, plan check about 3 to 4 weeks, and resubmittals about 2 weeks. A Hold Harmless Agreement and an Address Application are required. The current plan meets the 2025 code. Earlier plans, 374 to 750 sq ft in studio, one- and two-bedroom layouts, remain usable only on Eaton Fire red-tagged properties from January 1, 2026.

The limits are plain too. Standard plans are meant for lots that are not on a slope, a hillside or expansive soil, and a geotechnical report may be required. Openings cannot sit within 5 feet of side or rear lot lines. There are also ADU size limits in certain hillside areas. If your backyard rises or the soil swells, a custom drawing is the honest route.

Historic districts change the answer. In a Pasadena historic district, a new attached or detached ADU is permitted only if it is not visible from the public right-of-way. The same districts are exempt from ADU parking. If the unit would show from the street, the district rule decides.

Funding has a local angle too. The city of Pasadena describes a Second Unit ADU loan program offering a build with nothing paid out of pocket and three years of no payments. That program is the city's, not ours, and we cannot judge who is eligible, so ask the housing office before setting a budget. Fees need a check as well: impact fees are barred by state law for an ADU of 750 sq ft or less, and Pasadena's page quotes its Residential Impact Fee against another size, so we confirm the figure with the city first.

Pasadena ADU Rules and Permits

Pasadena says its updated ADU and JADU regulations took effect May 20, 2024. Advice written before that date may be out of date. We work from the city's current page and the HCD ADU Handbook (March 2026).

Pasadena has another timing fact worth knowing. State law requires a decision within 60 days on a complete application (HCD ADU Handbook, March 2026). Pasadena's published 3 to 4 weeks applies to standard plans, and the city's page states no review time for a non-standard plan, so we treat the 60 days as the outer line and ask the city for the rest.

What the City Allows

ADU Work We Plan for Pasadena Lots

The twelve kinds of ADU work we plan for Pasadena lots, with the local rule that touches each.

Family and Rental Units in Pasadena

Family units for owners

With 42.5% of Pasadena's occupied homes owner-occupied, a family unit often houses a relative on the owner's own lot. The city's standard plans range from small studios to two-bedrooms in the older set, and the current plan meets the 2025 code. We compare that free plan with a custom drawing, because a plan that fits the lot saves time at plan check and a poor fit costs it.

Plan my backyard home

Rental units

Renters live in 57.5% of Pasadena's occupied homes. State law requires that a 66323 ADU or JADU rent for longer than 30 days, so a vacation rental is not the plan. For an investor-owner, we plan the second entrance, the meters and the parking answer together, and we tell you early if a historic district hides the unit from the street.

Plan my backyard home

Starting an ADU in Pasadena

  1. 01

    Call with the address

    Tell us the street, then we ask about slope, soil and whether it sits in a historic district.

  2. 02

    Visit and soil check

    We walk the yard for slope, fence lines and setbacks, and say if a geotechnical report is likely.

  3. 03

    Standard or custom

    You get a written price for the route that fits, the city's free plan or a custom drawing.

  4. 04

    Submit and resubmit

    We submit to Pasadena, handle the 2-week resubmittals and send the Address Application and Hold Harmless form.

Cities Next Door

More pages for cities close to Pasadena.

Pasadena ADU Questions

Are Pasadena's ADU standard plans really free?

Yes. Pasadena says its ADU Standard Plans are free from the City. The page lists a new plan that meets the 2025 California Building Code, plus earlier plans from 374 to 750 sq ft. Those earlier plans are usable only on Eaton Fire red-tagged properties from January 1, 2026. We still price a custom drawing next to it so you can compare.

How long does Pasadena plan check take for an ADU?

For standard plans, Pasadena says completeness review takes 1 to 2 business days, plan check about 3 to 4 weeks, and resubmittals about 2 weeks. The page states no time for non-standard plans. State law sets 60 days for a complete application, so that is the outer line. We confirm anything more with the city.

Will Pasadena's standard plan work on a sloped lot?

Usually not. Pasadena's standard plans are meant for lots that are not on a slope, a hillside or expansive soil, and a geotechnical report may be required. Openings cannot be within 5 feet of side or rear lot lines. On a sloped or swelling lot we draw a custom plan from the start.

Can I build an ADU in a Pasadena historic district?

Yes, with a condition. In a Pasadena historic district, a new attached or detached ADU is permitted only if it is not visible from the public right-of-way. The same districts are exempt from ADU parking. We look at the street view and the backyard together before we draw a unit.

About us. Eagle Rock Backyard Homes plans backyard homes for owners in Los Angeles and Los Angeles County. Scope and price are agreed in writing before any work starts. More about us.

Plan My Pasadena Backyard Home

Call Eagle Rock Backyard Homes with your address. We say if Pasadena's free plans fit your lot or a custom drawing does.