ADU Questions for Los Angeles Owners
Twenty answers on contracts, rules, timing and renting, with the source linked where a rule is cited.
These are the questions owners ask before they sign anything for an ADU in Los Angeles. They are grouped by what you are trying to settle: what it costs and how the contract works, what the rules allow, how long it takes and what the build is like, and what you can do with the unit once it exists.
One rule for reading them. An answer states the rule or the way we work, and your lot can change both. Where a city sets its own limit, we say to check with the city, and we check it with you at the site visit.
ADU Questions: Cost and Contracts
Why won't you give a price for a build over the phone?
Because the price sits in the lot. Slope, access through the side gate, how far the utilities run and what the slab or the old garage walls turn out to be all move the number, sometimes by tens of thousands. So the first call sets up a site visit, and the price comes in writing after it. The ranges on the cost page are for planning only.
Are impact fees and school fees added on top?
Sometimes. Units of 750 square feet or less pay no impact fee under state law, and a JADU is exempt up to 500, while a bigger unit is charged in proportion to the main house (HCD ADU Handbook, March 2026). Inside Los Angeles, park and linkage fees do not apply to ADUs, but LAUSD school fees do once a unit passes 500 square feet (LADBS bulletin). Other cities set their own lists.
How much are permit and plan check fees?
LADBS bases permit and plan check fees on the project's valuation, so a bigger build costs more (LADBS). Our planning range for government and school fees together on one ADU is $5,000 to $20,000, drawn from published Los Angeles-area figures. The city sets the real number, and we read it from the fee schedule once the design is fixed.
What does a home improvement contract have to include?
Under Business and Professions Code 7159, a contract over $500 must be in writing, state the progress payments tied to completed work, and give you three days to cancel, five if you are a senior. It must also carry a notice that it is illegal to collect for work not yet completed or materials not yet delivered. If a draft leaves any of that out, ask for it before you sign.
When do payments come due on an ADU job?
The contract should list payments in dollars and cents against specific finished work, such as foundation, framing, rough utilities and final inspection, which is what CSLB tells ADU homeowners to look for (CSLB guidance). A small down payment comes first, within the legal cap. Payments that are not tied to work done are a reason to stop and ask questions.
ADU Questions: Rules and Permits
Who sets the size limits, the state or my city?
Both. Each city can write its own size cap, with a floor: at least 850 square feet, and 1,000 for a unit with two or more bedrooms. If a city has no compliant ordinance, state defaults take over: 1,200 square feet for a new detached unit, half the main house for an attached one. The smallest an efficiency unit can be is 150 square feet (HCD ADU Handbook, March 2026).
How close to the property line can an ADU sit?
No more than 4 feet may be required from the side and rear lines, and a unit that sits in the footprint of an existing structure needs no added setback (HCD ADU Handbook, March 2026). One Los Angeles detail: a converted wall closer than 5 feet to the line (3 feet with sprinklers) needs a 1-hour fire rating. Fire zones and separation from other buildings may add limits.
Do I have to replace the parking I lose?
Not for a garage conversion. State law says parking removed by converting or demolishing a garage need not be replaced, and an ADU may need at most one space per unit or bedroom, with many exemptions such as a half mile walk to transit or a historic district (HCD ADU Handbook, March 2026). Los Angeles requires none for a JADU or an ADU inside an existing structure.
Does a new detached ADU need solar panels?
Usually yes. The 2025 Energy Code treats a new detached ADU as a newly built building, so it needs newly installed solar PV unless an exception applies, and the panels may be added to the main house's system (California Energy Commission). An attached ADU counts as an addition and is exempt. Conversions of existing space generally are too.
Should I use a pre-approved ADU plan?
Maybe. LADBS offers a Standard Plan Program whose pre-approved plans shorten plan check, though a final review of site conditions and clearances still happens before a permit issues. Every city in California has had to offer such a program since January 1, 2025 (HCD ADU Handbook, March 2026). Flat, simple lots suit them best; a slope or a narrow yard usually calls for drawings made for the site.
ADU Questions: Timing and the Build
How long from the first call to move-in?
As a planning guide, a detached ADU takes about eight to twelve months overall and a garage conversion about half that or a little more, with hillside, coastal or custom-plan jobs running longer. None of it is a promise, because the city controls its own review calendar. Design, city review and construction each take a share of the total, and a delay in the first usually pushes the others back.
Why does the paperwork take longer than the building?
Design and drawings usually take about one to two months, and city plan check commonly runs two to four months with correction rounds. Building a detached unit then takes about four to six months, a little less for a garage conversion. A complete first submittal saves the most time, because each correction round restarts part of the city's review.
Do I need to be home during the build?
No. You do not need to be home all day. Before work starts we agree on access to the yard or garage and a way to reach you for decisions and inspections. Expect a few calls where something needs your say, such as a finish choice or an unexpected find in a wall, and a few days when someone should be reachable for an inspection.
How is my yard, driveway and the street handled?
Deliveries and the dumpster are planned around your driveway and the street, and materials and waste stay on your property. Neighbors get notice before noisy work such as demolition or a concrete pour. Where the yard is reached through a narrow side gate, the site visit settles how materials will get in, and the added labor is priced before work starts.
What about dust, debris and a toilet on site?
Expect a fenced yard, with dust and runoff controls set up the way the city requires. A dumpster and a portable toilet remain until the last day, then the debris leaves with the crew. Tell us at the visit if a neighbor is sensitive to dust or a pet uses the yard, and the plan accounts for it.
ADU Questions: Renting, Selling and Paying
Can I rent an ADU on a short-term basis?
Not in most cases. A JADU and any ADU created under section 66323 may be rented only for terms longer than 30 days, so nightly rentals are out. A city may require the same of other ADUs (HCD ADU Handbook, March 2026). If a short-term rental is the plan, say so on the first call, because it can change which type of unit makes sense.
Can I sell the ADU separately from the house?
Only in narrow cases. State law allows a separate sale only where a city has adopted a condominium ordinance, or under a limited exception for qualified nonprofits (HCD ADU Handbook, March 2026). Santa Monica adds that an ADU in its R1 district needs a recorded deed restriction to rent or a condominium sale under its code. Ask the city before you count on a sale.
Is there help paying for an ADU?
One city has a program on record. Pasadena lists a Second Unit ADU loan with no construction cost paid up front and no payments for the first three years (City of Pasadena). Read the city's page for terms and eligibility. In the other cities, ask the housing or planning office directly, since funding and who qualifies shift from year to year.
Do I pay new water and sewer connection charges?
Utility hookup charges are mostly off the table. A typical ADU is not counted as a new residential use for water and sewer capacity fees unless it comes with a new single-family home (HCD ADU Handbook, March 2026). Two things remain. Los Angeles wants Bureau of Engineering sewer clearance for every ADU, and any upgrade the unit needs to the pipes or the meter is paid on top.
Is an ADU the same as a granny flat or in-law unit?
They are the same idea under different names. The law's term is accessory dwelling unit, and a junior ADU is the small version built inside the house. Granny flat and in-law unit are everyday names. The name does not change the rules. What counts is the unit's size, its location on the lot and whether it has its own entrance, kitchen and bath.
More ADU Questions?
Send your address and the space you have, and the answer comes back for your lot.