Skip to content
Junior ADU (JADU) Conversions in Los Angeles, CA: junior adu jadu in progress in Los Angeles

Junior ADU (JADU) Conversions in Los Angeles, CA

A JADU turns a bedroom or an attached garage bay into a small home inside your house. Learn the 500 square foot rules before you call.

  • 500 sq ft, inside the house
  • Written price after a visit
  • No impact fee at 500 sq ft

A JADU is the smallest legal second home on a lot and the least expensive of the ADU family, with a planning range of $50,000 to $150,000 against $100,000 to $220,000 for a garage conversion. Junior ADU (JADU) conversions in Los Angeles, CA suit a spare bedroom with a side door, an attached garage bay or a room off the entry, and they give up the thing a detached unit has: a building of its own.

The limits are short and firm. California law (HCD ADU Handbook, March 2026) says a JADU is no more than 500 square feet and sits entirely inside a single-family house, with an attached garage counting as inside. A JADU of 500 square feet or less pays no impact fee, and Los Angeles asks for no parking for one.

Tell us which room you have in mind and where its door is. We tell you what the walls, the plumbing and the panel would have to do before a plan exists.

Junior ADU (JADU) Conversions in Los Angeles, CA and Nearby Towns

JADU calls come from Burbank, where a handout lists an owner-occupancy covenant for JADUs, Pasadena, whose updated ADU and JADU rules took effect May 20, 2024, and Long Beach, where owner occupancy depends on a shared bathroom.

When a JADU Makes Sense for a House

A JADU begins with a room you already own. These six starting points show how much work it needs.

A spare bedroom with a door that opens to the side yard

Spare bedroom with a side door

A bedroom beside an exterior door is the easy start, since the separate entrance may already exist.

The attached garage bay of a 1960s ranch house with a side door

Attached garage bay

An attached garage counts as space inside the house for a JADU, up to the 500 square foot cap.

A bedroom with no kitchen, only a bare wall and a window

Room with no kitchen

A room with no kitchen needs a cooking area added, so the plan has to find wall space and plumbing for it.

A shared hall bathroom with a single door and a towel rack

Shared bath down the hall

A JADU may share the house's bath, which needs an interior connection and brings owner-occupancy rules.

A bonus room off the front entry with its own small window

Bonus room off the entry

A room off the entry may already have the separate door, and the plan checks how it joins the house.

An old basement stair with a bare bulb at the bottom

Basement stair that goes nowhere

Basement space may work, though exits, ceiling height and moisture are checked before anything is drawn.

JADUs for Family, Caregivers and Tenants

A JADU suits a relative, a caregiver or a tenant, and each one changes what the plan needs.

Family and caregivers

A JADU with a shared bath and an interior connection keeps a parent or caregiver close to the main house, with a separate exterior door for privacy. With its own bath, state law drops the owner-occupancy rule. Either way, the unit is part of your house, so a parent keeps the same roof and the same front yard.

Plan my backyard home

Tenants

As a rental, a JADU must run on terms longer than 30 days. If it shares a bathroom with the house, state law keeps owner-occupancy in play, so you would live in the house or in the JADU. A tenant with their own bath and door has more privacy, and the plan adds the plumbing for it. Rents are yours to research.

Plan my backyard home
Junior adu jadu at a rental or multi-unit property

How a JADU Conversion Goes

A JADU works inside walls you already have, so the order begins with what is behind them.

  1. 01

    Walls and plumbing check

    Door locations, plumbing stacks and the panel are measured and photographed before the plan.

  2. 02

    Plans and plan check

    We file the application and answer corrections, and a city has 60 days to rule on a complete one under state law.

  3. 03

    Kitchen, bath and entry

    The cooking wall, bath work, exterior door and connection to the house are built in that order.

  4. 04

    Inspections and final

    The city inspects stage by stage, and a final signoff closes the permit.

The JADU Rules That Trip People Up

Start with where the unit sits. A JADU has to be contained entirely within the walls of a single-family house, so it cannot be a detached building. That is the dividing line with the in-law unit and detached options.

Owner-occupancy is next. State law says a city cannot require it for an ADU, and for a JADU it applies only if the JADU shares sanitation facilities with the house. City handouts vary. Burbank lists an owner-occupancy covenant for a JADU, while Long Beach limits it to a JADU that has a bathroom in common with the main dwelling. Ask your city before you plan around it.

Rental and sale rules come after that. Nightly stays are out for a JADU, because California allows renting one only for terms longer than 30 days. In Santa Monica, a JADU deed restriction bars selling it separately.

Sprinklers and walls come last. A JADU needs sprinklers only if the house already has them. Within 5 feet of the property line, or 3 feet if the house is sprinklered, a JADU conversion wall has to be a 1-hour fire-rated exterior wall, LADBS says.

Layouts That Fit Inside 500 Square Feet

The cap measures the unit, so a garage bigger than 500 square feet cannot all become the JADU. One workable shape is a single bay with a wall built between it and the second bay, and the plan has to show how the two parts separate.

In a spare bedroom the work is a bath, a cooking wall and a door. Plumbing is the cost driver, so the plan puts the kitchen on the wall that shares a stack with the bath. Without a bath of its own, the unit needs a separate exterior entrance with an interior connection to the house.

A bonus room or basement corner starts with exits and light. We draw the entry first, then the bed, then the cooking wall, and move each until the plumbing and the door line up. (A drawing on paper beats a guess in the room.)

JADU Limits, Owner Living Rules and Layouts

The JADU decision turns on the bathroom. A JADU may share the house's bath, and then it needs a separate exterior entrance with an interior connection. If it has its own bath, state law says owner-occupancy does not apply. Plumbing a second bath costs money, so a shared bath is the lower-cost plan and an own bath is the plan that lets you live elsewhere.

The 500 square feet counts the whole unit, with its kitchen and bath inside it. Existing walls, doors and plumbing stacks set the layout, so the plan works around them. (A kitchen on the same wall as the bath is cheaper to plumb.) A kitchen wall that lands on the wrong side of a bearing wall changes the price fast.

Layout comes last, and it has to fit all of that inside the cap. A unit with its own bath gives up floor area to the bath, so the sleeping and cooking areas shrink to make room.

  • Shared bath, with an interior connection and owner-occupancy rules
  • Own bath, with extra plumbing and no state owner-occupancy rule
  • Kitchen wall placed against an existing plumbing stack
  • Whole unit kept at or under 500 square feet
Plan my backyard home
Junior adu jadu: the bigger version of the job

What You'll Live With During the Work

A JADU is inside your house, so you live with the work in a way a backyard unit never asks.

How long
Paperwork comes first: one to two months of drawings, then about two to four of city plan check, corrections included. Building happens inside walls that already stand, so its length turns on how much kitchen and bath work the plan needs, which the first visit settles.
Mess and cleanup
Plastic sheeting and a closed door separate the work area from the rest of the house. The dumpster and portable toilet stay outside, and we clean up and haul debris at the end of the job.
Do I need to be home
For the first visit and the final walk-through, and for decisions along the way. We agree on access to the room in advance and a way to reach you for inspections.
Permits
Your signature goes on the forms the city requires, and the application and corrections come from us. LADBS handles ADU and JADU permits in Los Angeles, and its plan check runs online through ePlanLA.
Deposit and payments
On the money side, the up-front payment is held to 10 percent of the price or $1,000, whichever is lower, with the contract in writing and a three-day cancellation window (Bus. & Prof. Code 7159). After that, each payment is tied to a finished stage.

What Moves the Price of a JADU

For a JADU inside the main house, up to 500 square feet, published Los Angeles-area figures run $50,000 to $150,000. Kitchen and bath work, a separate entry and the condition of the electrical and plumbing move it. Compare quotes on what they cover, since design and permits are in some and not in others.

JobFigure
JADU built inside the house, up to 500 sq ft
Kitchen and bath work, separate entry, electrical and plumbing condition
$50,000 to $150,000
Design and floor plans
One plan set; engineering is extra
$7,500 to $25,000
Utility connections
Only if the plan changes panel, water or sewer
$3,000 to $20,000
In-law unit in existing space, 500 to 800 sq ft
For comparison; kitchen, bath, entry and egress work
$60,000 to $175,000
Garage conversion ADU, for comparison
A full ADU in a 350 to 500 sq ft garage
$100,000 to $220,000
The JADU range is a planning figure pulled from Los Angeles-area builder price pages in November 2026. Your house sets the real number.. Try the cost estimator.

Junior ADU Questions, Answered

What is the difference between a JADU and an ADU?

A JADU is no more than 500 square feet and sits entirely inside a single-family house, and it may share a bathroom with the main house. An ADU can be a new detached building of up to 800 square feet that state law protects, with a city ordinance allowing at least 850. The size and the shared bath are the dividing lines.

Do I have to live in the house if I add a JADU?

Under state law, only when the JADU shares a bathroom with the main house. With its own bath, owner-occupancy does not apply. Long Beach follows that rule, and Burbank's handout lists an owner-occupancy covenant for a JADU, so your city may add to it. Ask the planning counter in your city.

Can I rent a JADU on a nightly basis?

No. Short-term rental is out, since California lets a JADU go to a tenant only on terms longer than 30 days. That holds whether the unit shares a bath or has its own. A monthly tenant is the realistic plan, and rent is something to research with a local broker.

Does a JADU need its own exterior door?

A JADU without its own bathroom needs a separate exterior entrance with an interior connection to the main house, under state law. The handbook states that rule for the shared-bath case. If your JADU has its own bath, ask LADBS or your city what the entry needs before the plans are drawn.

Can I keep one garage bay for my car and convert the other?

A JADU can take one bay of an attached garage as long as the unit stays at or under 500 square feet. Los Angeles asks for no parking for a JADU, and state law does not require replacing parking removed by a garage conversion. The plan has to separate the two bays, and the city checks that wall.

About us. Eagle Rock Backyard Homes plans backyard homes for owners in Los Angeles and Los Angeles County. Scope and price are agreed in writing before any work starts. More about us.

Junior ADU (JADU) Conversions in Los Angeles

Call Eagle Rock Backyard Homes with the room you have in mind and where its door is. The written price comes after a site visit.